The overhaul life of the patented combined furnace lining of the power generation boiler invented by Luohua Company is more than 10 years, and it has obtained 6 patents, 2 ministerial appraisal results, and the third prize of the Luoyang Municipal Government Science and Technology Progress Award
Retail price
0.0
Market price
0.0
Number of views:
1000
主要参数
Quantity
-
+
Stock:
0
Project introduction
Project introduction

The overhaul life of the patented combined furnace lining of the power generation boiler invented by Luohua Company is more than 10 years, and it is rarely repaired during operation. In 1995, Yueguangxi academician of Tsinghua University and experts from the Institute of Thermal Energy of the Chinese Academy of Sciences came to our unit to appraise the achievements. In 2001, "Research on non-metallic new hanging structure composite furnace wall structure and new material application at the top of circulating fluidized bed boiler"; "Domestic research and application of imported large circulating fluidized bed (CFB) and intermediate reheat natural circulation boiler lining" was appraised by China Nonferrous Metals Industry Association in 2007, and "Research on non-metallic new hanging structure, composite furnace wall structure and new material application at the top of circulating fluidized bed boiler" won the third prize of Luoyang Municipal Government Science and Technology Progress Award.

  The project has obtained the patent number of Anti-wear Structure at the Bottom of the Furnace Hole of Circulating Fluidized Bed Boiler (200720091848.5), the patent number of Anti-wear Structure at the Coal Drop Tube of Circulating Fluidized Bed Boiler (200720091849. X), the patent number of Anti-wear Structure Design at the Boundary of Boiler Lining (200710055138.1), and the patent number of Localized Lining Structure of Large Circulating Fluidized Bed Boiler (200710055139.6) The patent number 01262211.7, the patent number 01262212.5, and the patent number 01262212.5 of the new non-metallic hanging furnace lining structure at the top of the circulating fluidized bed boiler.

serial number industry Applied unit Types and specifications of kilns Use position service condition
1 power Kaifeng Yu Long chemical co., ltd 3× 46t circulating fluidized bed boiler General contractor for new construction and furnace lining Continuous operation without maintenance
2 power Shanxi zhenxing aluminium electricity group 240t/h circulating fluidized bed boiler Demolition of the old cylinder, design and installation of the new central cylinder. After the transformation, the output of the original boiler reached 240t/h from 210 t/h.
3 power Shanxi faxin group Jiangxi Boiler Factory produces 75t/h circulating fluidized bed boiler. The whole boiler is put into operation by contracting, charging and baking. Continuous operation without maintenance.
4 power Tangshan Xinde Boiler Group Co., Ltd. Xinjiang Nongyishi Two 85t/h circulating fluidized bed boilers General contracting for new construction and lining of two boilers Continuous operation without maintenance
5 power Luoyang yonglong electric power co., ltd. Mengjin thermal power plant 240t/h circulating fluidized bed boiler General contractor for new construction and furnace lining Appraisal of achievements.
6 power Tianjin Binhai Energy Company Limited Circulating fluidized bed boiler 130T/H contract for labour and materials at a lump sum It works well and has not been repaired so far.
7 power Luoyang Yuneng Sunshine Thermoelectric Co., Ltd. 440t/h circulating fluidized bed boiler General contractor for new construction and furnace lining Appraisal of achievements.
8 power Sino-Korean Joint Venture Qinhuangdao Tonghe Thermal Power Plant 170T/H circulating fluidized bed boiler General contractor for new construction and furnace lining Appraisal of achievements.
9 power Shanxi Xiangning Huaxin electric smelting company 130T/H circulating fluidized bed Newly-built two German Bagok furnaces and lining general contractors. Appraisal of achievements.
10 Solid waste Sino-US Joint Venture Xingyang Gangue Power Plant 260t/H fluidized bed boiler 2 new sets, the furnace lining general contractor. Run well
11 power Fengying Power Plant of Coking Coal Group 240T/H circulating fluidized bed boiler General contractor for new construction and furnace lining Run well
12 power Shanxi haixin iron & steel company 130T/H circulating fluidized bed boiler Three new sets are built, and the furnace lining is always contracted. Run well
13 power Jinchuan group company 75T/H circulating fluidized bed boiler Overhaul 3 sets, pour the whole, and guide the oven. It works well.
14 power He' nan yulian energy co., ltd 440T/H circulating fluidized bed Furnace lining general contracting, cyclone feeding Good operation, continuous operation for more than 137 days.
15 power "Chinalco" Zhongzhou Branch 130T/H thermoelectric boiler 4 #, 5 # furnace lining integral casting. Run well
16 power Shanxi zhenxing aluminum company 2 sets of 240T/H circulating fluidized beds. Overhaul of 4#5# boiler, solve the problems of central tube falling off and furnace wall collapse at the top, contract for work and materials, and guide oven drying. Run well
17 power Xin' an aluminum group 440T/H circulating fluidized bed boiler Slag cooler and combustion chamber Run well
18   Jiaozuo wanfang aluminum company 2 sets of 440T/H intermediate self-heating recirculation boilers. Fire belt and other key parts. Run well
pulverized coal fired boiler
19 power Panjin Liaohe oilfield fuliteng thermoelectric company Denmark imported 220T/H fluidized bed boiler. overhaul Run well
20 power Shandong hongri group 35T/H fluidized bed boiler Please ask us to solve the problem after the roof of the new furnace collapses. It has been put into operation well so far
21 power Qinhuangdao Tonghe thermoelectric co., ltd China-Korea Joint Venture 75T/H Fluidized Bed Boiler 3 sets of continuous overhaul, contracting for materials and baking. It has worked well so far
22 power Xinjiang Bayi steel works Circulating fluidized bed boiler 75T/h Two sets of contractors guarantee materials and guide oven drying. It has worked well so far
23 power "Chinalco" Zhongzhou Branch Circulating fluidized bed boiler 220T/h Two sets of contractors guarantee materials and guide oven drying. It has worked well so far
24 power Dongning Power Plant in Heilongjiang Province Circulating fluidized bed boiler 75T/h Two sets of contractors guarantee materials and guide oven drying. It has worked well so far
25 Solid waste Pingdingshan Mining Bureau Gangue Power Plant Circulating fluidized bed boiler 75T/h 4 sets of contractors guarantee materials and guide the oven. It has worked well so far
26 power Pingdingshan Mining Bureau No.4 Mine Power Plant Circulating fluidized bed boiler 35T/h Two sets of contractors guarantee materials and guide oven drying. It has worked well so far
27 power Huludao Zinc Plant Thermal Power Plant Circulating fluidized bed boiler 75T/h-434 etc. 4 sets of contractors guarantee materials and guide the oven. It has worked well so far
28 power Gansu Jinchuan company power plant Circulating fluidized bed boiler 75T/h-434 3 sets of contractors guarantee materials and guide the oven. It has worked well so far
29 power Pingdingshan Sanhe power plant Circulating fluidized bed boiler 75T/h Two sets of contractors guarantee materials and guide oven drying. It has worked well so far
30 power Kaihua Group Power Plant Circulating fluidized bed boiler 75T/h-466 Contractor guarantees materials, and guarantees oven drying. It has worked well so far
31 power Kaifeng boiler plant supports power generation, steam, power and other units 10T/h~20T/h boiler type of circulating fluidized bed boiler 7 sets of contractors guarantee materials and guide the oven. It has worked well so far
We could not find any corresponding parameters, please add them to the properties table
Previous
Next

Key word Luohua Company 

Related patents

Awarded

New nonmetallic hanging structure, composite furnace wall structure and application of new materials at the top part of circulating fluidized bed boiler

Certificate of appraisal of scientific and technological achievements

Appraisal Certificate of Scientific and Technological Achievements

Previous page

Relevant performance

There is currently no content to display
Please add data record on website background.

Online Message

Username used for comment:
客户留言
Description:

Quick navigation

      Online Message

Message application name:
客户留言
Description:

scan

scan